Sunday, Aug. 3 – IBM, clockwise

Loading Events

« All Events

  • This event has passed.

Sunday, Aug. 3 – IBM, clockwise

August 3 @ 8:30 am - 1:00 pm
Hi team,
This Sunday, we will head to IBM from the clockwise direction. We will head out of Los Gatos via Kennedy road and take Coleman till we pass Almaden Lake Park. From there we will turn right into the neighborhoods. At mile 13 we will stop for bathroom/water at Bernal-Gilman-Joice Ranch park. Then, we will head to IBM. We will regroup at the summit before descending IBM to the intersection of Harry Rd and Camden. From there, we will paceline from Camden to Redmond and make our way back over Kennedy to Mike’s Bikes.Round trip, the ride is 30 miles with 1,800 ft of elevation gain. Wheels roll at 8:35 am sharp.

The link to the route is available on Strava, see the link below.

Please read the ride safety protocol if you are interested in attending.

Please RSVP on Strava if you plan to attend.

Do not hesitate to contact me if you have any questions.
Sincerely,
Rachel

Details

Date:
August 3
Time:
8:30 am - 1:00 pm

Organizer

Rachel Vasquez

Venue

201 N Santa Cruz Ave, Los Gatos, CA 95030
201 N Santa Cruz Ave
Los Gatos, CA 95008 United States
+ Google Map
Scroll to Top